Specifications include, but are not limited to: All necessary landscape architectural, civil, structural, geo-technical, surveying, engineering services, lighting design, graphic design or other professional services necessary for the design, solicitation of bids for construction, permitting and construction of the project. The contract shall include construction contract administration assistance, including bidding assistance, attendance at bi-weekly construction progress meetings during the construction contract, review of submittals and responses to Requests for Information (RFIs). The project proposes a multiuse trail adjacent to the roadways along S. Cemetery Street, Mitchell Road and Pinnacle Way, with connecting trails between those roadways. The project includes upgrades to existing sidewalks, landscaping, crosswalks, and connections to the new Pinnacle Park. This project begins at Mitchell Road/Buford Hwy and ends at Beaver Ruin Road in 2 locations.