Loading...
Skip to main content
< Back to results

WILLIAM E. DANDY MIDDLE SCHOOL - SMART PROGRAM RENOVATIONS


Location
Florida
Publication Date
07/31/2019 10:36 AM EDT
Closing Date
09/10/2019 10:00 AM EDT
Issuing Organization
Broward County School District
Solicitation Number
Description

Specifications include, but are not limited to: •Replace the entire fire alarm system and provide missing exit signs. •Repairs to the existing aluminum covered walkways. BUILDINGS •Building 1 (Administration): Re-roofing; replace air handling unit in Mechanical Room 120. •Building 2: Re-roofing and HVAC Equipment replacement. •Building 3: Re-roofing. •Building 4: Re-roofing and chillers replacement. •Building 5: Re-roofing and install missing exit signs. •Building 6: Re-roofing and install missing exit signs. •Building 7: Re-roofing and install missing exit signs. •Building 8: Re-roofing and install missing exit signs. •Building 9: Re-roofing and install missing exit signs. •Building 10: Re-roofing and install missing exit signs. •Building 11: Re-roofing and install missing exit signs. •Building 12 (Group Restroom): Re-roofing. •Building 13 (Group Restroom): Re-roofing. •Building 14 (Group Restroom): Re-roofing; painting of exterior offsite •Building 15 (Group Restroom): Re-roofing. •Building 16 (Media Center): Re-roofing. •Building 17 (Group Restroom): Re-roofing, painting of exterior soffit. •Building 18 (Group Restroom): Re-roofing; renovation of Female Student Restroom 311. •Building 19 (School Health Center): Re-roofing and install missing exit signs. Included in the re-roofing: •Provide new modified bitumen built-up roofing over existing '/.." per foot sloped lightweight insulated concrete. (Existing insulation value is approximately R-20 based on record drawings). •Remove abandon E9d rooftop equipment and unneeded close-up openings in the roof deck, if any. •Correct current deficiencies in roof drainage. •Replace horizontal and vertical roofing expansion joints. •Upon removal of the existing roofing membrane, inspect the roof deck. Where found damaged or deteriorated, replace all such areas of the roof decking. •Relocate rooftop equipment currently located closer than 10 feet to the roof edge, or provide railings at the roof edge (as required by the Florida Building Code). •Raise the stands for rooftop equipment to provide a minimum of 24-inch clearance from the bottom of the supports to the new finished roofing surface (if and where such clearance would not be provided after the installation of the new insulation/roofing system). Where shown in drawings, provide new curbs for stand and curb-mounted rooftop equipment in order to provide a minimum height of 18 inches from the new finished roofing surface to the top of the curb. Provide hurricane tie-down straps at rooftop equipment if and where missing. •Raise existing plumbing vents as required to provide proper flashing. •Plumbing vents close to parapet walls shall be rerouted away from the parapet. •Reinforce the roof structure (if and where necessary to support relocated equipment).

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids