The Home Owners Association in the Vista Verde Phase 3 area deeded the private roads in their community to the City of Miami Gardens since they were not able to maintain them. To reduce flooding and repair the damaged roads in the Vista Verde neighborhood Phase 3, the roadway surfaces in these areas and the drainage are being improved. Phase 3 is the section from NW 215 St ROW to about 1,200 north of NW 215th St. ROW between NW 39th Avenue ROW to about 1,600 feet East of NW 39th St. ROW. The existing drainage is insufficient to capture the runoff from the adjacent streets. To reduce future flooding events, the Contractor will install additional drain field, catch basins, drain pipe and inter-connect the existing drainage piping. Also the contractor will clean existing drainage piping with associated structures. This project includes all site restoration activities.