Specifications include, but are not limited to: A design-build firm to provide design, permitting and construction services for the Urban Core Riverfront Revitalization and Complete Streets: Hart Bridge Expressway & Talleyrand Connector Project. This project includes the following: 1. Demolition of the SR 228 Hart Expressway Overpass (aka Commodore Point Expressway) from west of A. Philip Randolph Blvd. to east of Festival Park Avenue 2. Major construction activities include, but are not limited to: a. New west and east ramp connections of remaining Hart Expressway Overpass to Bay Street which will include: i. Bridge structures ii. New roadway alignment iii. Retaining walls b. New roadway alignments from: i. Bay Street at Hogan’s Creek Bridge to east of Georgia Street ii. East of Metropolitan Park entrance to new east ramp connection c. Widening of A. Philip Randolph Blvd. & Bay Street d. Mill and resurface portions of: i. Gator Bowl Blvd ii. A. Philip Randolph Blvd iii. Bay Street e. Stormwater drainage f. Shared use paths g. Signing & Pavement Marking, including Guide Sign Panel replacement h. Roadway lighting i. Signalization j. ITS k. Bridge strengthening for existing western Hart Expressway Overpass to remain (as necessary) 3. Other services required include but are not limited to: a. Utility design & coordination b. Geotechnical exploration, analysis, and ground improvements