Specifications include, but are not limited to: 1. Existing metal roofing panels are to remain. Surface prep panels as required to remove rust and/or loose debris. Replace any loose or missing fasteners with one size larger. Insure that remaining fasteners are tight and properly set. 2. Remove existing gutters, downspouts and metal trim. Prepare edges to receive new metal blocking per the project details. 3. Remove existing translucent skylight panels and replace with new 24 gage Galvalume steel roof panels to match existing, “nest” with existing metal roof panels and secure to underlying steel structural framing. 4. Remove existing raised ridge vent assemblies and cover deck opening and replace with new 24 gage Galvalume steel roof panels to match existing, “nest” with existing metal roof panels and secure to underlying steel structural framing. 5. Remove existing flood lights and antennas along wall panel and properly store on-site for reinstallation. Coordinate with owner before removal. 6. Install prefabricated metal curbs at the new gooseneck vent locations indicated on the roof plans.