Specifications include, but are not limited to: Delivery of Certified DOT base rock material for road maintenance projects on Babcock Ranch Preserve. This work has been broken into 3 projects: • Project 1: (Repair 1, 2) supplying, delivery, and tailgate spreading DOT base rock material on Brown’s Farm Grade for a total repair distance of 2 miles; estimate of 264 loads or 5808 tons. • Project 2: (Repair 3, 4, 5) supplying, delivery, and tailgate spreading DOT base rock on North Unit Grade and Cypress Head Tier II Camp entrance for a total repair distance of 2.3 miles; estimate of 303 loads or 6680 tons. • Project 3: (Repair 6, 7, 8, 9) supplying, delivering, and tailgate spreading DOT base rock on Tram Grade for a total repair distance of 3.3 miles; estimate of 435 loads or 9584 tons. • Project 4: (Alternate 10, 11) supplying, delivering, and tailgate spreading DOT base rock material on Tram Grade. Unforeseen inclement weather during the project may require stockpiling DOT base rock within the designated project area.