Specifications include, but are not limited to: The RC will remove and replace the approximately 9,000 sqft shingle roof in accordance with attached drawings and Project Manual. RC is to be mindful of keeping a safe and clean worksite and ensuring a safe access to the facility for LIBRARY patrons and staff. The LIBRARY intends to be fully operational while this project is underway. 1. Perform RC duties to ensure the removal and replacement of the Eatonville Branch Library roofing system as noted in the Project Manual and on the attached drawings. Including obtaining all required permits, arranging all inspections and final Certificate of Occupancy/Completion. 2. Ensure compliance with ALL Federal, State and Local codes and regulations (ie: building, roofing, fire, electrical, plumbing, life/safety, etc.). 3. Ensure a safe and clean work area by keeping work area free from debris throughout the day and at the end of the day (especially food and drink waste). RC is to provide and maintain barricades, temporary lighting and other safety devices required by applicable regulatory agencies. 4. Review each site to verify existing conditions with LIBRARY’s Project Coordinator prior to starting the construction phase. 5. Maintain a qualified full-time non-working supervisor on the job site while work is in progress. The Supervisor shall monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.