Specifications include, but are not limited to: Furnish and install new chilled water valves, heat valves and actuators as required by the new installation. • Furnish and install new temperature gauges at heat and chilled water supply and return piping. • Furnish and install new reheat piping, strainers and stream traps. • New pipe insulation shall be installed as required. • Furnish and Install new ductwork & insulation as required. Some ductwork may require rework or reinforcement. • Provide new UV resistant PVC condensate drain lines and roof supports. • Reconnect the unit to electrical service, fire alarm, BAS controls. • Perform start-up of the new equipment. Test & certify proper operation upon completion of project. • Provide test and balance service. Include the report in the close out documents. • Provide the Project Manager all close out documents with five (5) copies of the OEM manuals and the disposal certification.