Specifications include, but are not limited to: Remove existing Chiller Coils at both locations. The work shall include, but is not limited to, all supervision, labor, equipment, materials, tools, machinery, transportation and other facilities and services necessary for the removal of the existing Chiller Coils and the purchase and installation of new Chiller Coils at the Purchasing Warehouse and Fleet Management location as specified below. Contractor must provide temporary chiller during the replacement of the Chiller Coils to provide cooling for the building. Provide all necessary piping, electrical, control wiring, refrigerant lines, new Evaporator Chiller barrel insulation and chilled water piping to provide a complete and fully operating machine. Chiller coils must be coated with manufactures recommended treatment type to protect equipment from corrosive environment, product submittals will be required.