Specifications include, but are not limited to: Contractor shall provide all materials, quality workmanship and labor in the preparation and applications of the work plan; and, execute a program to locate, inventory, inspect, clean out, assess, exercise, operationally test, flush, paint, mark, perform minor repairs, document attribute characteristics for inclusion in the City’s GIS for assigned distribution system valves and hydrants. Contractor shall work with the City to regularly analyze the results of the assessment program to inform repair requirements. Additionally, all data and a final asset report must be delivered to the City. The results of this program shall be used by the Contractor to evaluate, develop and deliver a sustainable approach to on-going and long-term asset management of underground infrastructure in the City Water Distribution System.