Specifications include, but are not limited to: The scope of work is to replace the entire asphalt surface of UNF Parking Lot 3 and rehabilitate or replace the existing limerock base in order to prevent future damage to the new pavement. This job includes the removal of the existing asphalt layer and compactions of the existing limerock base. Any areas where the compacted limerock base yields, will need to be removed and replaced with a new limerock base. A new asphalt layer will be installed over the entire Parking Lot 3 area with the finished surface to match the existing curb lines. Pavement striping will occur after the resurfacing operations are complete. This work is to be performed primarily during the UNF winter break from December 8, 2018 through January 2, 2018.