Specifications include, but are not limited to: 1. Pre-construction project planning including assistance in the preparation of a schedule, preliminary cost estimate and value engineering measures. 2. Removal and replacement of restroom facilities to ADA requirements. 3. Install privacy fence screen wall outside of restroom doors. 4. Install 2'x16' concrete sidewalk widening with turn down edge. 5. Replace all under-slab and in-wall plumbing for new restroom facilities 6. Install new lighting and exhaust ventilation. 7. Install new switches, receptacles, and wire per NFPA 70-2017 NEC. 8. Development and refinement of cost estimates and project schedules. 9. Construction administration and observation including conferences, weekly site observation and meetings. 10. Project closeout, establishment of warranties and guarantees.