Specifications include, but are not limited to: Competitive hourly pricing for all Cessna 172 and 182 models which shall include pilot services and fuel. The awarded CONTRACTOR shall conduct two [2] reconnaissance flights in March 2019, one [1] series of manatee distribution surveys along the coast of the Florida panhandle between April 2019 and March 2021 with surveys generally occurring once or twice per month (totaling 36 surveys), and two [2] contingency flights if needed. The survey will cover coastal areas from the Aucilla and Wakulla Rivers to Apalachicola Bay and Lake Wimico. Flights will start and end at Tallahassee International Airport. The project will require approximately 200 survey hours (approximately 5.5 hrs./aircraft/survey including commute to/from the survey area each trip). Pilots will be asked to fly at an altitude of 750 feet and a speed of 80-90 knots in the general pattern of a predetermined flight path (navigating off of a flight line).