Specifications include, but are not limited to: 1)Install up to approximately 5,375 linear feet of 8-inch gravity PVC sanitary sewer pipe, including approximately 28 sanitary manholes. 2)Abandon up to approximately 17 existing sanitary manholes in accordance with the Construction Plans.3)Remove up to approximately 27 existing sanitary manholes in accordance with the Construction Plans. 4)Tie-in up to approximately 110 existing service laterals which are located on the same side as the new sanitary sewer lines.5)Install and tie-in up to approximately 3 new service laterals which will be flipped from the existing connection location on one side of the property to the new sanitary sewer line on another side of that property. 6)Install approximately 41 service laterals for vacant lots.7)Provide the City with: Warranties, guarantees, lien releases, as-built drawings, etc.; and 8)Warranty the completed project for one (1) year and provide services as required during the one (1) year warranty period.