Specifications include, but are not limited to:. This scope of work includes inspecting and cleaning both Isolated Phase Bus (IPB) systems between the GTE wall flex links and the step-up power transformers. The Bidder shall furnish all equipment, supervision, labor, transportation, tools and expendables to inspect, clean, and make repair recommendations, for the existing IPB. The purpose is to ensure that the duct, bus, flex-links and insulators are sufficiently clean and that the duct is properly sealed against moisture intrusion. If any equipment is found to be damaged, it will be up to the JEA Project Manager (PM) to decide if the equipment is to be left as-is, repaired or replaced. It is expected that any existing damage, corrosion or any other issue(s) that might have previously affected reliability, or issues that may affect reliability in the future be brought to the attention of the PM immediately. Prior to any work on the IPB, the Foreman shall walk down the clearance with the PM and Engineer to gain an understanding of JEA’s Lock Out Tag Out (LOTO) and to ensure safety prior to starting work. A daily meeting with the Contractor Foreman or Contractor PM shall be completed with the JEA PM to go over any safety issues, discovery, project status, and the project schedule.