Specifications include, but are not limited to: The pipeline improvements along Moody Road, the installation of approximately 900 feet of ten inch HDPE along the west side of the bridge using horizontal directional drilling (HDD), crossing 24 feet under Hancock Creek, and ending north of the intersection of Seaworthy and Moody Road. The opencut portion along Moody Road will be 8 inch PVC. The pipeline improvements along Hancock Bridge Parkway include a 1700 ft. horizontal directional drill using 12-inch HDPE, crossing 36 feet underneath Yellow Fever Creek and open-cut replacement of the existing pipeline with 10-inch PVC along Hancock Bridge Parkway from the eastern most HDD location to just west of Palm Avenue.