Specifications include, but are not limited to: This project is comprised of the removal and disposal of the existing halon system in its entirety, the expansion of the water-based fire suppression system and the installation of a new NOVEC 1230 (gaseous system) to protect Server Room 250. Construction of this project is to be turn-key and will include all aspects of work including but not limited to: removing and disposing of the existing HALON system to include all tanks, piping, sensors, etc., installing a new NOVEC 1230 system in room 250 and connecting this system to existing fire alarm system, connecting to and expanding the existing water-based fire suppression system in the communications room 236, the removal and sealing of all ductwork serving Room 250 only and provide mini-split HVAC system for this room, and the verification and sealing of the perimeter of Server Room 250 above ceiling & below floor. The contractor is responsible for all associated material, permitting, equipment, labor, as-built plans, and permit closure as applicable as per the specifications provided herein.