Specifications include, but are not limited to: 1. Check the general operation of the unit. 2. Log the operating temperatures, pressures, voltages, and amperages. 3. Check the operation of the purge unit(s). 4. Check the operation of the control circuit. 5. Check the operation of the lubrication system. 6. Check the operation of the motors and starters. 7. Annual coil cleaning at a minimum or per manufacturer’s recommendations. 8. Analyze the recorded data. Compare the data to the original design conditions. 9. Review operating procedures with operating personnel. 10. Create a comprehensive chiller plant inspection report and provide to the College within 7 days of completion of each of four (4) quarterly inspections per year. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected.