Specifications include, but are not limited to:. The scope of work for this project includes general contracting services for the renovation of existing Operating Room #21 located within the main operating room area on Sarasota Memorial Hospital’s Main Campus (Critical Care Tower Level Two), 1700 S. Tamiami Trail, Sarasota, Florida. Work may Include, but not limited to, pre-construction phase services such as cost estimating, value engineering, critical path method scheduling, constructability reviews and cost control. Construction work may include selective interior demolition of existing partitions, ceiling, and interior finishes Construction work may include management of owner-provided wall system installation and modular utility ceiling system installation, as well as management for the installation of new owner-provided medical, storage, and imaging equipment. Construction work may include the installation of new interior finishes, as well as new electrical, mechanical, medical gas, and plumbing system connections for the renovated space and new equipment.