Specifications include, but are not limited to: The existing Readiness Center roof consists of two types: a barrel vault roof over the Drill Hall (74'-5 1/2"x117'-11 1/2") and a surrounding flat roofed perimeter on 3 sides of the Drill Hall (+/- 5086 sf). Due to wind damage of the roof having caused leaks during the hurricane, we need to remove the roofing on both portions and reroof with standing seam metal roofing on the vaulted space and a modified bituminous roofing system on the flat roofed portions. The contractor shall insulate the roof according to code and repair all interior and exterior water damaged finishes. Contractor will be responsible for disposal of debris. We want a 20 year NDL warranty on the modified bituminous roof. The 60' x 125' Maintenance Building had 20% of its metal roof blown off, causing damage to the entry and two offices in that building.