Specifications include, but are not limited to: a. Utility Services: 1. Determine utility connection requirements and include in Base Bid all costs to Owner for utility service. 2. Include costs for temporary service, temporary routing of piping or any other requirements of a temporary nature associated with utility service. b. Temporary Services: 1. Division 01 - Temporary Facilities and Controls. c. Continuity of Service: 1. No service shall be interrupted or changed without permission from Architect and Owner. Obtain written permission before any work is started. 2. When interruption of services is required, Architect, Owner, and other concerned parties shall be notified and shall determine a time. d. Demolition: 1. Division 02 - Selective Demolition. 2. Perform demolition as required to accomplish new work. 3. Accomplish work in neat workmanlike manner to minimize interference, annoyance or inconvenience such work might impose on Owner or other Contractors. 4. Unless otherwise noted, remove from premises materials and equipment removed in demolition work. 5. Equipment noted to be removed and turned over to Owner, shall be delivered to Owner at place and time Owner designates. 6. Where materials are to be turned over to Owner or reused and installed by Contractor, it shall be Contractor's responsibility to maintain condition of materials and equipment equal to that existing before work began. Repair or replace damaged materials or equipment at no additional cost to Owner. 7. Where demolition work interferes with Owner's use of premises, schedule work through Architect, Owner and with other Contractors to minimize inconvenience to Owner. Architect must approve schedule before Contractor begins such Work. e. Concrete Work: 1. Provide cast-in-place concrete as required by Contract Documents unless otherwise noted. 2. Provide anchor bolts, metal shapes and templates required to be cast in concrete or used to form concrete for support of mechanical equipment. a. Clean systems after installation is complete. b. Clean piping internally and externally to remove dirt, plaster dust or other foreign materials. When external surfaces of piping are rusted, clean and restore surface to original condition. c. Clean pipeline strainers to restore them to original condition or replace with new strainer elements. d. Clean equipment and plumbing fixtures as recommended by manufacturers. e. Replace throwaway or replaceable media air filters used during construction period with new filters or new filter media after construction has been completed and before building is turned over to Owner. Filter replacement shall be as hereinafter specified. f. Blow and clean dirt, plaster dust and other foreign matter from coils, terminal devices, diffusers, registers and grilles.