Specifications include, but are not limited to: All maintenance of traffic. • Notification to public safety departments of work within the right-of-way that would result in detours of emergency vehicles. • Clipping and herbicide as necessary for paving preparation. • Scraping material from edge of road to establish even pavement edge and provide drainage from the roadway surface to the adjacent swale drainage system. • Milling of existing roadway surface. • Leveling or grading of existing roadway surface. • Adjustment of existing utilities to match new pavement elevations. • Delivery of material to site (hauling). • Application of prime and/or tack coat(s). • Roadway Structural Repairs. • Superpave Type SP-9.5 asphalt Overlay. • Replacement of any existing Striping, Markings, and RPM’s. • Street sweeping, as necessary, & final clean-up of job site and repair of any damage caused by paving activities. • Sod placement