Specifications include, but are not limited to: The work consists of furnishing all labor, equipment, and materials for the construction of the facilities consisting of the following primary components: 1. Expand the capacity of the rapid infiltration basins (RIBs) by modifying the existing 15-cell RIB system to create four (4) larger RIBs as shown in the drawings and in accordance with the project manual. 2. Construct seepage barrier. 3. Demolish and replace feed piping to the RIBs to the limits shown in the drawings. 4. Demolition and modifications of the yard piping, magnetic flowmeter, control valve and other appurtenances as required to replace and relocate the flow metering station as shown in the drawings. 5. Electrical demolition and modifications as necessary to replace and relocate the existing flow meter as shown in the drawings. 6. Coordination with the construction of two (2) monitoring wells (by others).