Specifications include, but are not limited to: County Road 278 from SR 73 to SR 71 - 1.67 Miles The Work includes resurfacing and re-construction of County Road 278 (Peacock Bridge Road) from State Road 73 to State Road 71. The section before and after the bridge that has curb and structure will be paved to the curb, without blocking the drainage structure. The road will be widened to 24' with 12' lanes. The work also includes resurfacing and reconstruction of the road including reclaim existing asphalt, dig out and reconstruct the failed areas prior to reclaiming, 1-1/2 of structural asphalt and 1" surface or friction course. Shoulders will be paved 4' on each side of the road with base and 1-1/2" asphalt. The existing asphalt will be mixed in (reclaimed) to create a new base, a 1-1/2" structural course will be applied, and a 1" Friction Course will be applied using SP 9.5. Pipes will be replaced or extended as indicated and mitered ends or headwalls will be replaced. Ditches will be re-graded at pipe ends (to 100' each direction) and as indicated on drawings. Driveways will be cutback to match the grade of the paved shoulder at the intersection.