The Work includes resurfacing and re-construction of County Road 162 (Jacob Road) from State Road 75 to State Road 71. The section from SR 75 to CR 167 is 24 feet wide, and will have 4 foot paved shoulders added (except for the bridge). The section from CR 167 to SR 71 is only 20' wide with 10' lanes. This section will be widened to 24' with 12' lanes. The work also includes resurfacing and reconstruction of the road including reclaim existing asphalt, dig out and reconstruct the failed areas prior to reclaiming, 1-1/2 of structural asphalt and 1" surface or friction course. Shoulders will be paved 4' on each side of the road with base and 1-1/2" asphalt. The existing asphalt will be mixed in (reclaimed) to create a new base, a 1-1/2" structural course will be applied, and a 1" Friction Course will be applied using SP 9.5. Pipes will be replaced or extended as indicated and mitered ends or headwalls will be replaced. Ditches will be re-graded at pipe ends (to 100' each direction) and as indicated on drawings. Areas where the base has failed will be dug out and repaired prior to reclaiming. In addition, the Chipola River Bridge joints will be cleaned and the seals will be replaced.