The work consists of but is not limited to the removal of, or abandonment and grouting of existing 8-inch and 12-inch asbestos-cement, ductile iron and PVC wastewater force mains and 24” steel casing pipe. The work also consists of the installation of 12” PVC and HDPE force mains to be placed within the utility easement located on the pond and rear of lots along Coliseum Boulevard, the utility easement located on the pond and in the rear lots facing Longwood Avenue, crossing County and FDOT drainage ways and Sailors Way, along Seaboard Lane and across to the east side of State Road 776 (McCall Road). The total length of the project is approximately 2500 lineal feet. The force main crosses two bodies of water and a highway which will require horizontal directional drilling or other trenchless techniques for installation.