Specifications include, but are not limited to: • all structural improvements, roof replacements, specialty masonry improvements and all other necessary exterior envelope improvements required by the contract documents • the replacement of all windows and doors as per the specified details approved by the Historic Preservation Committee (approved by HPC on 11/14/18) • all interior build out scopes of work including but not limited to: repair and replacement of interior load bearing and non-load bearing walls, including the installation of all insulation, acoustic, and drywall materials as specified in the contract documents • all mechanical, electrical and plumbing installations as well as the installation and commissioning of a proposed elevator. In addition, the general contractor shall also be responsible for the construction of all exterior site, drainage, landscape, irrigation, signage and lighting improvements as specified in the contract documents.