The scope of work for this project may include programming, schematic design, design development, construction documents, and construction administration for all architectural, interior design, mechanical, electrical, plumbing, fire protection and structural design work services for the renovation of existing office, utility and storage areas for new use as two new Cardiac Catheterization Labs. Work for this project will also include the renovation of existing office areas for new use as Cardiac Storage; Cardiac Family Waiting; Cardiac Offices; and 10 new Cardiac pre- and post- procedure bays. This project is envisioned to occur in multiple phases to allow the unit to remain in use throughout. The project is located within the main cardiology area on Sarasota Memorial Hospital’s Main Campus (East Tower Level Two), 1700 S. Tamiami Trail, Sarasota, Florida.