Specifications include, but are not limited to: The project generally involves the construction of approximately 3 miles of reclaimed water line and a reclaimed booster station to be known as the MOUNT DORA APOPKA RECLAIM TRANSMISSION. DESCRIPTION OF WORK: The work generally includes the furnishing of all labor, materials and equipment for the construction of the new City of Mount Dora, Mount Dora Apopka Reclaimed Water Interconnect Project, consisting of the following principal items: the installation of approximately 3 miles of 16 and 24 reclaimed waterline via open trench and directional bore methods along Round Lake Road and Kelly Park Road in Orange County. Also included is the construction of a reclaimed water booster pump station. Contractor shall provide all labor and materials to provide a complete and operational project.