Specifications include, but are not limited to: 1. Remove existing membrane, insulation and existing flashings to existing wood decking. 2. Verify and re-secure existing wood roof deck as necessary to meet 2017 Florida Building Code and authorities having jurisdiction. Submit all fastening pattern to engineer for approval. 3. Install new tapered insulation meeting minimum requirements of FBC 2017. 4. Install new gypsum cover board and insulation board. 5. Install new 2-ply modified bitumen roofing system as indicated on drawings. 6. Provide and install all sheet metal and accessories as indicated on the drawings. All sheet metal flashings, counter flashings, and copings required for this project shall be installed per project documents or authorities having jurisdiction, whichever is greater. 7. Provide contactors roofing guarantee for complete water tight system for a period of five years from substantial completion of project.