Specifications include, but are not limited to:GENERAL - The work specified in this section shall consist of mixing material from existing pavement with new aggregate (as required) in a suitable central plant, and placing the recycled mix to conform with the lines, grades, thickness, dimensions, and notes as specified on the Typical Pavement Plans. All plant, methods and equipment shall conform to the requirements of these Specifications and FDOT Specifications 320, except as modified or amended herein. Construction requirements for all asphaltic concrete pavements shall conform to the requirement of these Specifications and, except as modified or amended herein, FDOT Specifications Section 330. All recycled asphaltic concrete mixes shall have the same general composition of mixture and stability as the appropriate "TYPE" of asphaltic concrete specified for the project. The Contractor shall be responsible for the design of asphalt mixes, which incorporate reclaimed asphalt pavement as a component part.