Specifications include, but are not limited to:The work includes; cleaning the existing sloped metal roofing system, refastening and sealing all exposed perimeter fasteners, raising existing rooftop equipment, vents and VTRs to minimum 10”above finished roof surface, installing 3” rigid insulation board in pan of roof between each seam and mechanically fastening 2”of rigid insulation board to create a level surface, fully adhering a ½”high density cover board to meet current FBC wind uplift requirements, installing an 60 mil KEE single ply roofing with 60 mil KEE flashing system to provide a manufacturer’s 20 year NDL warranty. New roofing system to roof‐over existing roof drainage system and the work also to includes; cutting out new scupper openings, installing new pre finished aluminum collector head and downspout and enlarging existing overflow scuppers, installing new pre finished aluminum gutter and downspouts, and replace the existing metal coping with new pre finished aluminum coping