Specifications include, but are not limited to: Inspection / Report per Outfall: Inspection and reporting of each outfall. The report shall include the following for each outfall: Percent of blockage Length of pipe/box to be cleaned. Any cleaning in excess of 25 feet of pipe/box shall be noted Estimate of waste material to be removed Any damage found Estimate cost to repair damage Area of Mangrove Trimming that is required Verify pipe size and pipe material Location Photographs/Video Pipe Cleaning – All Sizes: For bid items 2-5, the vendor shall remove all dirt, barnacles and foreign materials at the outfall and up to twenty feet of pipe which is impeding the flow of storm water into the waterway. This item includes the use and placing of turbidity barriers.