Specifications include, but are not limited to: · 24 hour response time when service / repairs are needed. · Vendors must be an Authorized Service Provider (ASP) for multiple irrigation pump station manufacturer’s. · Verify performance of all pumps to include static pressure, dynamic flow and pressure not only per design but also according to manufacturer’s pump curve. · Test pump control panel and verify that all connections and surge protection components are functioning properly · Verify all motor amperages at full load are within specifications. · Open and inspect all motor and variable frequency drive connections to prevent catastrophic failure from heated connections. · Service / grease pump motor bearings and check / maintain oil level (if applicable) · Operate all station valves to prevent premature failures from lack of use. · Test pressure tank to insure proper air pressure according to pump start pressures. · Check condition of pump seal and / or packing.