All work shall be completed in accordance with Industry Standards for new construction, which will require the following: • Floors must be level and free from defects. • Walls must be plumb, warped studs straightened or removed. • Windows: Rough openings must be plumb and level, units must open, close, and lock properly. • Exterior Doors: Thresholds must be flashed with valley flashing then caulked prior to installing unit. Units must be blocked in opening with shims at top hinge, bottom hinge and at keeper. Screws are to be installed through hinges into frame work. Thresholds will be supported by a soldier course of brick or concrete pad. • Roofing must be installed per code, to include proper valley flashings; eave metal to be factory baked on enamel finish and must be installed under felt under-layment; first course of shingles must be spot fastened to starter course with plastic roofing cement. • Vinyl Siding must be installed over an approved vapor barrier; must be nailed per manufacturers specifications; and must include all vinyl accessories.