Specifications include, but are not limited to: The intent is for a contractor to selectively demo existing heat pump AHU, connections and components as required to accomplish replacement, including, but not necessarily limited to: electrical connections, ductwork, refrigerant lines and condensate drain lines. Properly dispose of the existing equipment and provide turnkey installation to furnish and install new equipment detailed below. The contractor shall carefully perform selective demolition to safeguard the existing equipment which is scheduled to remain and be reconnected. All work shall conform to Florida Building code and the authority having jurisdiction requirements. The bidder’s lump sum should be inclusive of all costs and incidental items related to the full and complete scope, include any and all items that are necessary for a complete workmanlike installation.