Specifications include, but are not limited to:Furnish all labor, materials, supervision, and equipment necessary to construct a new raw water well pump to the new Gibson Oaks well with associated piping, fittings, valves, electrical equipment, controls and other appurtenances.The project consists of the construction of a new potable water production facility (WPF) and the construction of off-site raw water and potable water mains to connect the WPF to the existing public water system. The WPF portion of the project includes establishing a new entrance to the site and a new roadway on-site, conducting a gopher tortoise survey of the site and obtaining permitting for gopher tortoise relocation, site clearing, tree and debris removal, stormwater facilities, one well pump into an existing drilled well, a one million gallon prestressed ground storage tank, high service pump station, chemical storage & feed facilities, electrical/operations building, SCADA system, standby power, site improvements, a new on-site subsurface wastewater disposal system (including permitting), modifications to the remote well site at Lake Gibson, and other ancillary/incidental work required to construct a fully functioning WPF.