Specifications include, but are not limited to: For the waste services monitoring program, the number of ground water samples are estimated to be 61 and the number of surface water samples are estimated to be 16 per semi-annual cycle. The Cost Table quote below is based on covering the waste services 2020 spring sampling event including projected trip and equipment blanks. This quote may also be used for the 2020 fall sampling event or for any emergency or specialty sampling needs including non-aqueous testing. Reports will consist of standard PDF reports to include both permit and remedial action reports for the Perdido and Beulah landfills and ADaPT electronic data deliverables to include standard batch QC. Turn-around time is 14 calendar days for standard PDF reports and 30 calendar days for ADaPT files. Any samples rendered unusable due to laboratory failure (such as but not restricted to missed hold time) will result in the contract lab re-sampling at no cost or monetary compensation for the county to perform the re-sampling.