Specifications include, but are not limited to: On site visits and investigation reviews; boundary, topographical and utility surveys along with tree surveys indicating any protected species; geotechnical & subsurface soil investigation with building foundation recommendations and percolation tests required for drainage calculations; determination of utility capabilities and wetland delineation; attendance at user design conferences to finalize the design; prioritize project components, additive bid items and programming; site improvements such as clearing; grubbing; grading; drainage and storm water management; landscaping; essential utility services as well as geothermal and solar photovoltaic renewable energy systems; private and military organizational vehicle parking areas with loading ramp; all required roads & sidewalks; 72 hour emergency power generator with automatic transfer switch; Antiterrorism Force Protection Standards; Electronic Security Systems; voice and data communications with structured cabling network systems; fire protection system with alarm.