Specifications include, but are not limited to: Quantity: 2,400 Tons Description: FDOT Approved Finish Grade Limerock Delivery: The material is to be delivered to and stockpiled at Cary State Forest located in Bryceville, Florida (APPENDIX I). All delivered loads must be accompanied by a load ticket indicating the number of tons associated with each load. The staging areas are located inside the boundaries of Cary State Forest. Directions to the staging area are as follows: Starting from the intersection of US HWY 90 and US HWY 301 in Baldwin, FL. go North on HWY 301 for approximately 7 miles. Take a RIGHT onto Pavilion Rd. at the Cary State Forest entrance. Follow Pavilion Rd. for .4 miles until it intersects with Fire Tower Rd. Go left for .15 miles. The lime rock delivery site will be on the right.