Specifications include, but are not limited to: The work under this contract consist of District-Wide Desilting and Video Inspection of Storm Sewer System- routine maintenance. 0425- 74- 1 MANHOLES & INLETS CLEANING & SEALING, <10' EA 10.000 0425- 74- 2 MANHOLES & INLETS CLEANING & SEALING, >10' EA 10.000 0425- 78- INLET CAP, PRECAST EA 10.000 0430- 94- 1 DESILTING PIPE, 0 - 24" LF 164,998.510 0430- 94- 2 DESILTING PIPE, 25 - 36" LF 47,698.880 0430- 94- 3 DESILTING PIPE, 37 - 48" LF 22,402.860 0430- 94- 4 DESILTING PIPE, 49 - 60" LF 564.000 0430- 94- 5 DESILTING PIPE, 61" OR GREATER LF 4,340.710 0430- 95- 1 OUTFALL BARNACLE REMOVAL, 0 - 24" LF 500.000 0430- 95- 2 OUTFALL BARNACLE REMOVAL, 25 - 36" LF 400.000 0430- 95- 3 OUTFALL BARNACLE REMOVAL, 37-48" LF 250.000 0430- 95- 4 OUTFALL BARNACLE REMOVAL, 49-60" LF 150.000 0430- 95- 5 OUTFALL BARNACLE REMOVAL, 61" AND GREATER LF 100.000 0430-950- DESILTING CONCRETE BOX CULVERT CY 250.000 E101- 72- MOBILIZATION (EMERGENCY RESPONSE) EA 2.000 E425- 73- 1 CLEANING MANHOLES AND INLETS (MECHANICAL) EA 100.000 E425- 73- 3 FRAME AND GRATE (F&I) EA 5.000 E425- 73- 5 CLEANING MANHOLES AND INLETS (MANUAL) EA 50.000 E432- 4- STORM SEWER INSPECTION (VIDEO CAMERA) LF 240,004.960