Specifications include, but are not limited to: 7 10 Initial Bridge Inspection: Bridges newly constructed or inventoried requiring Initial Bridge Inspection as a pre-acceptance construction inspection and shall require that a bridge record file be established electronically in the format designated in the Bridge and Other Structures Inspection and Reporting Procedure and the requirements of this Scope as set forth herein. 5 7 Post Rehabilitation Bridge Inspection: Bridges, which will undergo “substantial” rehabilitation, as determined by the ENGINEER, shall require Post Rehabilitation Bridge Inspection as a pre-acceptance construction inspection. The Post Rehabilitation Inspection Report shall be prepared in the same manner as an Initial Inspection. Each section of the bridge record file shall be revised electronically in the format designated in the Bridge and Other Structures Inspection and Reporting Procedure and the requirements of this Scope as set forth herein. 4 6 In-Service Bridge Inspection: Bridges, which will undergo phased (staged) construction shall require In-Service Bridge Inspection. The In-Service Bridge Inspection Report shall be prepared in the same manner as an Initial Inspection for the portions of the bridge planned to be open to traffic. 2.2.3 5 7 Post Repair Bridge Inspection: Bridges which will undergo "substantial" repair, as determined by the ENGINEER, shall require Post Repair Inspection. The Post Repair Inspection report shall be prepared with emphasis on the satisfactory or non-satisfactory completion of repair work.