Specifications include, but are not limited to: furnish all material, equipment, labor, tools, machinery, incidentals and service necessary for the removal and disposal of approximately 64ft per unit of DIP Sludge piping for both Belt Filter Press No.1 and No.2. Contractor/Vendor will then be responsible for the installation of new 6” DIP piping along with new fittings, 6” chain wheel plug valves (same as existing) and flow meters. The two flow meters will be supplied by the City. This will be a turnkey project (except for wiring of new flow meters). Contractor/Vendor shall also be responsible for installation of all new supporting brackets/hardware, anchor rods and to be of 304/316 Stainless steel. As well as all nuts and bolts to be of 304/316 Stainless steel.