Specifications include, but are not limited to: • The audit shall meet the Florida Department of Environmental Protection (FDEP) rules defined in Chapter 62-257, Florida Administrative Code (FAC) and the Asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP) adopted by reference in section 62-294.800, FAC. • Asbestos NESHAP regulations must be followed for demolitions of facilities with at least 80 linear meters (260 linear feet) of Regulated Asbestos-Containing Materials (RACM) on pipes, 15 square meters (160 square feet) of regulated asbestos-containing materials on other facility components, or at least one cubic meter (35 cubic feet) off facility components where the amount of RACM previously removed from pipes and other facility components could not be measured before stripping.