Specifications include, but are not limited to: The second floor of the building shall be equipped with one (1) Split System Heat Pump system. The air handler unit shall be an upflow model placed in the HVAC Closet in Room 203 as shown on the project drawings and shall be properly sized by the contractor to provide heating and cooling for the entire second floor area. The condenser unit shall be placed outside behind the building, in line with two other units which serve the rest of the building. Work shall include installation of new lineset between the outdoor and indoor unit; A new electrical circuit shall be provided for each receptable in proposed office areas. The circuits shall be fed from the existing 100 amp panel located in Closet 204. Fire safety lighting and bathroom exhaust fan shall be fed from the same panel. The new LED lights may be fed off of existing circuits. Electrical service to the new heat pump split system shall be provided by new circuits fed from the existing panel in the basement.