Specifications include, but are not limited to: • Contractor shall demo, remove and properly dispose of the existing BAC cooling tower and all related equipment. • Contractor shall provide and install a new BAC #VTL-072-K Cooling Tower complete with stainless steel basin, Or Equal The BAC #VTL-072-K is the stated preferred equipment. • Or Equal alternatives must match, equal or exceed all material specifications of the preferred equipment with all specification sheets provided with the proposal. The Town Engineer shall be the sole judge of if the alternative qualifies as Or Equal. Contractors may submit their alternative make and model in advance for a ruling as to if it will be accepted as Or Equal. • Contractor shall provide all necessary piping and wiring for the connections of the new tower • Contractor shall start up and commission new tower to manufacturer’s specifications.