Specifications include, but are not limited to: 1. Shingle and other roofing material colors to be selected by owner. 2. Obtain building permit. 3. The Contractor is responsible for supplying dumpsters and for removal and disposal of all removed material, trash, and debris from the project. 4. The job site shall be kept neat at all times and shall be fully cleaned at the end of each work day, including picking up any nails using magnets. 5. The driveways, parking lot, and building entrances shall be protected from debris during construction. The Contractor is responsible for safely conducting his operations to protect the public using the building. 6. Install new eave/rake starter strip shingles (GAF WeatherBlocker or approved equal).