Specifications include, but are not limited to: Deliver to the job site all back boxes which are to be installed by others. D. Furnish and install all wire and cable. E. Contractor to provide initial DSP and control system programming prior to acceptance testing, one full set of programming changes and adjustments ; Provide frequency scanning and coordination for all audio/video systems wireless transmitters and receivers. Coordinate with other Contractors and Owner as necessary to account for local frequencies used by others within the building, and to account for available spectrum in the surrounding area. I. Perform initial adjustments and verification tests. Submit verification test report. J. Participate in acceptance tests and perform final adjustments. K. Provide training sessions, as specified in section 3.15, to the Owner. L. Provide any manufacturer required commissioning and/or training and properly schedule with the manufacturer for their staff to attend. Coordinate schedule and training syllabus with owner and consultant. M. Provide system documentation including copies of all relevant drawings and equipment manuals.