Specifications include, but are not limited to: 1. Remove and dispose of existing masonry chimney. 2. Excavate, form and pour new footings. 3. Construct masonry chimney with orange berg flue. 4. Install stainless steel chimney cap. Chimney 1. Remove and dispose of existing masonry chimney and all related materials. 2. Excavate as required to a minimum depth of 42" below grade. 3. Form out and pour footings for new chimney. Footings shall be a minimum of 10" thick. 4. Construct new chimney using concrete masonry units and orange berg flue tiles. 5. Set concrete masonry units in bed of Portland cement-based mortar mix. Tool mortar joints recessed from face of masonry unit. Install wall ties to secure masonry units to sidewall of house.