Specifications include, but are not limited to: 1. All building equipment, furnishings, grounds landscaping, etc., shall be protected from damage of every description and any such damage thereto shall be repaired or otherwise made good at no expense to the State and to the satisfaction of the Facility Representative. 2. Supply and install any and all protective coverings and barricades necessary to protect at all times the public and building personnel from injury. 3. The contractor shall be held responsible for, and must make good at his own expense, any water damage or any other cause of damage due to improper protection. 4. Due to the nature of this institution, it is mandatory that all rules and regulations be strictly adhered to and the necessary precautions taken. 5. The contractorshall, during the progress of the construction, assume all responsibilities for loss or damage by fire to the work included in his contract until completion of the contract. No flammable material shall be stored in the structure in excess of the amounts allowed by the authorities. 6. The contractor is responsible to assure that all work is performed in accordance with all current State regulations including, but not limited to, OSHA, State Fire Codes, and the Basic Building Code of the State of Connecticut. 7. The contractor will at all times keep the premises free from the accumulation of waste materials or rubbish caused by his employees or work. All accumulated material shall be removed from the site daily at the contractors expense.